Keston Q28H Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Warmwasserbereiter & Kessel Keston Q28H herunter. Keston Q28H Installation Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 59
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Qudos 28h
User, Installation and Servicing
Instructions
FAN POWERED HIGH EFFICIENCY
MODULATING DOMESTIC CONDENSING
GAS HEAT ONLY BOILER
CE/PI No. 86-CM-43
Qudos 28h - GC No. 41-930-19
Qudos 28hP - GC No. 41-930-20
These instructions must be left either with the
user or next to the site gas meter.
Keston Heating
PO Box 103, National Avenue, Kingston Upon Hull, HU5 4JN
Tel. +44 (0) 1482 443005 Fax. +44 (0) 1482 467133
email : info@keston.co.uk web : www.keston.co.uk
COMPLIANT WITH BUILDING REGULATION PART L1 & L2
SEDBUK A RATED
WD 440
issue 7 - 2011
Seitenansicht 0
1 2 3 4 5 6 ... 58 59

Inhaltsverzeichnis

Seite 1 - Qudos 28h

Qudos 28h User, Installation and Servicing Instructions FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS HEAT ONLY BOILER CE/PI No.

Seite 2 - CONTENTS

function, automatic pump and fan exercise in periods of inactivity, anti cycle control anddry fire protection.2.2 BOILER SCHEMATICAir is drawn into

Seite 3 - Page : ii

The flue gases are piped in a 50 mm muPVC (BS5255 and/or and BSEN1329) plastic or,alternatively, 75mm Keston composite plastic pipe to outside. The t

Seite 4 - 0. HANDLING INSTRUCTIONS

BS 6891 : Low Pressure Installation PipesBS 6798 : Installation of Gas Fired Hot Water Boilers of Rated Input Not Exceeding 70kWBS 5449 : Installation

Seite 5 - Page : iv

2.4 PHYSICAL DATA - Qudos 28h & Qudos 28hPCabinet Height mm 680Cabinet Width mm 390Cabinet Depth mm 280Top Clearance mm 150Side Clearance mm 5Base

Seite 6 - 1. USER INSTRUCTIONS

2.6 PERFORMANCE DATA - Qudos 28h & Qudos 28hPSeasonal Efficiency (SEDBUK) = 91.1 (Qudos 28h) & 93.1 (Qudos 28hP)This value is used in the

Seite 7

appliance. When replacing these articles we recommend that the replaced items are notbroken up, but are sealed within heavy duty polythene bags,

Seite 8

3. BOILER LOCATION3.1 DIMENSIONS AND MINIMUMCLEARANCESThe boiler must be installed in minimumclearances shown to allow subsequentservicing,

Seite 9 - 2. GENERAL INSTRUCTION

Compartment installation is permitted - such compartments must be constructed inaccordance with BS 6798.The wall on which the boiler i

Seite 10 - ENTER RESET

The appliance must be connected to the 3A supply via a fused double-pole switchhaving at least 3 mm (1/8 inch) contact separation in both poles, servi

Seite 11

3.5 BOILER SIZE SELECTIONThe Qudos 28h will automatically adjust heat output to match the system requirements atany given time. Efficiency and co

Seite 12

CONTENTSNB : These instructions are an integral part of the appliance. This document must be handed over tothe user on completion of the installation

Seite 13

.WD440/3/2007 Chapter 3 - Boiler Location The Keston Qudos 28h & Qudos 28hP BoilersInstallation & Servicing Instructions Page : 15P

Seite 14 - (Factory Preset)

h Jointing should be either with capillary, threaded or compression fittings. Pipesshould have a gradient to ensure air is passed e

Seite 15

capable of meeting the flow rate required at the total pressure loss generated by the boilerand the rest of the system. The selected pump must comply

Seite 16 - 3. BOILER LOCATION

A 92.5o sweep elbow is equivalent to 1.0m straight length. A 45o bend is equivalent to0.5m straight length.50mm 75mmMaximum Air Inlet Length : 39.0m 1

Seite 17

The Keston Qudos 28h and Qudos 28hP, as with any condensing boiler, willgenerate a condensate “plume” from the flue terminal in a

Seite 18

External wall faces and any internal faces of cavity walls must be made good. Rubbercollars are available for flue and air terminals t

Seite 19

4. INSTALLATION OF THE BOILERRead Chapter 3 - Boiler Location and decide upon the position of the boiler.Installation of the boiler is straightforward

Seite 20

NB: When installing the boiler, consider:Flue Spigot AssemblyThe flue spigot (50mm muPVC) is inside the accessory bag.Put the flue spigot assembled wi

Seite 21 - Q28h hydraulic resistance

4.6 WATER SYSTEMConnect the flow and return HEATING CIRCUIT system pipework to the boiler. Details ofsystem requirements are given in Chapter 3 - Sect

Seite 22 - Figure 3.8.1 : Terminals

4.9 Advanced Features WiringThe Qudos 28h features comprehensive and advance functionality as standard.Whilst these advances functions are

Seite 23 - 7R%RLOHU

5.7 Combustion Testing5.8 Checking The Gas Pressure5.9 Timing The Gas Meter5.10 Handing Over To The User6 FAULT FINDING6.1 Electrical Control Sequence

Seite 24

4.9.3 Solar Control4.10 EXCHANGING A BOILERBefore removing an existing boiler add Fernox Supafloc, or equivalent cleaning agent, inaccordance with t

Seite 25

(minimum 18 mbar required for Natural Gas and 31 mbar required for LP gas). If all jointsare sound and the gas inlet pressure is satisfactory set t

Seite 26 - 4. INSTALLATION OF THE BOILER

5. COMMISSIONING OF THE BOILERImportant:This condensing boiler contains components which could be damaged or blocked by grease, dirt,solder etc., fr

Seite 27

“RESET” button so that the display reverts to show the actual flow temperature ofthe boiler. Once a heating demand is received the fan will start and

Seite 28

To measure CO2 levels in the Kestonboiler remove the 1/8" plug from theflue outlet pipe spigot (Figure 6.7.4item 17). Insert

Seite 29 - MAIN CONNECTOR

7) Press the “RESET” button twice to return to the normal operation mode anddisplay.5.8 CHECKING THE GAS PRESSUREWith the boiler running

Seite 30 - SOLAR PANEL

6. FAULT FINDING6.1 ELECTRICAL CONTROL SEQUENCEWhen the main external control(s) are calling for heat, power will be fed to the boiler

Seite 31

QUICK REFERENCE6.2 NORMAL OPERATIONThe Qudos 28h and Qudos 28hP boilers feature a user display which shows actual flowtemperature. Howev

Seite 32

6.3 FAULT MODESIf a situation is detected which the boiler considers may cause damage to the appliance the boilerwill enter a lockout mode and stop fu

Seite 33

ERROR HISTORYThe Qudos 28h has an internal memory function that stores the last six errorsencountered along with the sensor readings a

Seite 34

0. HANDLING INSTRUCTIONS0.1 LIST OF CONTENTSThe Keston Qudos 28h and Qudos 28hP are supplied almost totally pre-assembled. The unitsuse standard 50 mm

Seite 35

6.4 FUNCTIONAL FLOW WIRING DIAGRAMWD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInstallation & Servicing

Seite 36 - 6. FAULT FINDING

6.5 ELECTRICAL WIRING DIAGRAMWD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInstallation & Servicing Instruc

Seite 37 - QUICK REFERENCE

6.6 ILLUSTRATED WIRING DIAGRAMWD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInstallation & Servicing Instr

Seite 38 - 6.3 FAULT MODES

6.7 Exploded Assembly Diagrams6.7.1 Boiler Controls Assembly WD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInst

Seite 39 - ERROR HISTORY

6.7.2 Waterway, Condensate & Flue AssemblyWD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInstallation &

Seite 40

6.7.3 Air  Gas AssemblyWD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInstallation & Servicing Instructions

Seite 41 - 6.5 ELECTRICAL WIRING DIAGRAM

6.7.4 Casing AssemblyWD440/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28h & Qudos 28hP BoilersInstallation & Servicing Instructions P

Seite 42

6.7.5 Exploded Diagrams Parts Reference ListBoiler Controls Assembly (Fig. 6.7.1)GC Number Code Description111 Q28h Main Control PCB(Q.10S.4.01.00.0

Seite 43

7. ROUTINE (ANNUAL) SERVICINGTo ensure the continued safe and efficient operation of the boiler it is necessary to carry outroutine s

Seite 44

c. If necessary clean the burner with a mild household detergent and rinse under ahot running tap.d. If necessary, from visual inspection, clean

Seite 45 - 6.7.3 Air  Gas Assembly

then tilt the boiler forwards from its back onto its base and remove carton by sliding up overthe boiler. When lifting this appliance the back

Seite 46 - 6.7.4 Casing Assembly

8. REPLACEMENT OF PARTSCONTENTS8.0 GENERAL8.1 PRECAUTIONS8.2 ACCESS8.3 REPLACEMENT PROCEDURE8.4 ELECTRICAL COMPONENTS8.4.1 CONTROL PANEL8.4.2 BOILER F

Seite 47

8.4.2 Boiler Flow and Return Thermistors (Fig. 6.7.2 item 48)i) Isolate the appliance (Section 8.1)ii) Gain access (Section 8.2)iii) Remove the push o

Seite 48 - 7. ROUTINE (ANNUAL) SERVICING

iv) Unscrew the bolts (Fig 6.7.3 item 94) securing the gas inlet pipe to the gascontrol valve.v) Remove the four nuts securing the combustion blower (

Seite 49

8.7 HEAT EXCHANGER (Fig. 6.7.2 item 41)i) Isolate the appliance (Section 8.1)ii) Gain access (Section 8.2)iii) Shut off the water supply to the applia

Seite 50 - 8. REPLACEMENT OF PARTS

9. SHORT SPARE PARTS LISTItem GC No Part Denomination Item GC No Part Denomination42 Burner KIT 64 Burner Gasket55 Ignitor Gasket 43 Igni

Seite 51

163 Q28h Gas Valve - Mixer Assem. 91 FanQ28hP Gas Valve - Mixer Assem.112 Control Panel 111 Q28h Control PCB Q28hP Con. PCBWD440/

Seite 52

SHORT SPARE PARTS LIST FOR THE KESTONCONDENSING BOILER RANGEItem GC No Part Denomination42 Burner KIT64 Burner Gasket43 Ignitor KIT55 Ignitor Gasket48

Seite 53

WD440/3/2007 Chapter 10 : Benchmark Checklist Final The Keston Qudos 28h & Qudos 28hP Boilers Installation & Servicing Instructio

Seite 54 - 9. SHORT SPARE PARTS LIST

WD440/3/2007 Chapter 10 : Benchmark Checklist Final The Keston Qudos 28h & Qudos 28hP Boilers Installation & Servicing Instructio

Seite 55

bRead Installation Manual CarefullybEnsure that ALL dust particles, filings , plastic chips etc. areremoved from the inlet pipe.bIf the i

Seite 56 - CONDENSING BOILER RANGE

1. USER INSTRUCTIONS1.1 INTRODUCTIONThank you for choosing this Keston Qudos 28h for your household heating. The boiler isdesigned to be

Seite 57 - BENCHMARK No

Normal OperationDuring normal operation the digital display will show the current boiler temperature and willshow relevant operational symb

Seite 58 - SERVICE INTERVAL RECORD

1.4 SAFETY INFORMATIONIF YOU SUSPECT A GAS LEAK TURN OFF THE APPLIANCE IMMEDIATELY, TURN OFFTHE GAS TAP TO THE APPLIANCE (LOCATED UNDERNEATH) AN

Seite 59 - Qudos 28h and Qudos 28hP

2. GENERAL INSTRUCTION2.1 DESCRIPTIONThe KESTON Qudos 28h and Qudos 28hP boilers utilise the latest in condensingtechnology to produce

Kommentare zu diesen Handbüchern

Keine Kommentare