Keston Q28S Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Warmwasserbereiter & Kessel Keston Q28S herunter. Keston Q28S Installation Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 61
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Qudos 28s
User, Installation and Servicing
Instructions
FAN POWERED HIGH EFFICIENCY
MODULATING DOMESTIC CONDENSING
GAS SYSTEM BOILER
CE/PI No. 86-CM-43
Qudos 28s - GC No. 41-930-17
Qudos 28sP - GC No. 41-930-18
These instructions must be left either with the
user or next to the site gas meter.
Keston Heating
PO Box 103, National Avenue, Kingston Upon Hull, HU5 4JN
Tel. +44 (0) 1482 443005 Fax. +44 (0) 1482 467133
email : info@keston.co.uk web : www.keston.co.uk
COMPLIANT WITH BUILDING REGULATION PART L1 & L2
SEDBUK A RATED
WD 420
issue 7 - 2011
Seitenansicht 0
1 2 3 4 5 6 ... 60 61

Inhaltsverzeichnis

Seite 1 - Qudos 28s

Qudos 28s User, Installation and Servicing Instructions FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS SYSTEM BOILER CE/PI No. 86-

Seite 2 - CONTENTS

The boiler heat exchanger is made from highly corrosion resistant stainless steel incorrugated pipe form which provides massive surface ar

Seite 3 - Page : ii

bottom of the heat exchanger where it is separated from the flue gases and exits from theboiler through the condensate drain. Any condensate formed in

Seite 4 - 0. HANDLING INSTRUCTIONS

firing the boiler, for 10 seconds in the event the boiler is on standby for in excess of 24hours without firing. This is to help prevent se

Seite 5 - Page : iv

2.4 PHYSICAL DATA - Qudos 28s & Qudos 28sPCabinet Height mm 700Cabinet Width mm 435Cabinet Depth mm 280Top Clearance mm 150Side Clearance mm 5Base

Seite 6 - 1. USER INSTRUCTIONS

2.6 PERFORMANCE DATA - Qudos 28s & Qudos 28sPSeasonal Efficiency (SEDBUK) = 91.1 (Qudos 28s) & 92.9 (Qudos 28sP)This value is used in the

Seite 7

disturbed they will not be released. Since the boards are non-serviceable parts thereshould be no risk. Under no circumstances should the

Seite 8

3. BOILER LOCATION3.1 DIMENSIONS AND MINIMUMCLEARANCESThe boiler must be installed in minimumclearances shown to allow subsequentservicing,

Seite 9 - 2. GENERAL INSTRUCTION

Compartment installation is permitted - such compartments must be constructed inaccordance with BS 6798.The wall on which the boiler i

Seite 10 - ENTER RESET

BS 1363. There must be only one common method of isolation for the boiler andits control system.The appliance must be connected to the 3A supply via a

Seite 11

3.5 BOILER SIZE SELECTIONThe Qudos 28s will automatically adjust heat output and pump speed to match the systemrequirements at any given time. Ef

Seite 12

CONTENTSNB : These instructions are an integral part of the appliance. This document must be handed over tothe user on completion of the installation

Seite 13

g Copper tubing to BS 2871 Part 1 or barrier plastic pipe suitable to 110 oC, such asUnipipe, is recommended.h Jointing should be either with cap

Seite 14 - (Factory Preset)

m The installation must be designed to work with flow temperatures of up to 110 oC.All components of the system must be suitable for a working

Seite 15

If an additional pump is required the selected pump must comply with BS 1394. Provisionmust be made in the system design for control of the additional

Seite 16 - 3. BOILER LOCATION

Alternatively, where flue or air intake lengths of up to 60m are require, Keston Composite75mm flue and air pipe can be used (contact your KESTON Heat

Seite 17

section 3.11. Such drain points can be formed using standard muPVC fittings. Refer to theexample in Figure 3.8.3.3.8.4 TerminationsAir inlet terminals

Seite 18

3.8.6 Distance Between Flue Outlet & Air InletThere is no maximum - the terminations must not be on opposite sides of thedwelling bu

Seite 19

4. INSTALLATION OF THE BOILERRead Chapter 3 - Boiler Location and decide upon the position of the boiler.Installation of the boiler is straightforward

Seite 20

Put the flue spigot assembled with the test plug on the cabinet frame and secureit by fastening the two M6 screws. Couple the spigot to the internal f

Seite 21 - Pump Head (m)

4.6 WATER SYSTEMConnect the flow and return HEATING CIRCUIT system pipework to the boiler. Details ofsystem requirements are given in Chapter 3 - Sect

Seite 22 - Figure 3.8.1 : Terminals

5.1 Twin Thermostat Operation with Weather Compensation5.2 Modulation of DHW generationWD420/3/2007 Chapter 4 : Installation The Keston Qud

Seite 23 - )LJXUH

5.6 Hot Flushing5.7 Combustion Testing5.8 Checking the Gas Pressure5.9 Timing The Gas Meter5.10 Handing Over To The User6 FAULT FINDING6.1 Electrical

Seite 24

5.3 Solar Control4.9 EXCHANGING A BOILERBefore removing an existing boiler add Fernox Supafloc, or equivalent cleaning agent, inaccordance with the

Seite 25

Initial FiringThe gas pressure setting is factory adjusted to within the required range and doesnot need readjustment. If the reading is incorrect th

Seite 26 - 4. INSTALLATION OF THE BOILER

5. COMMISSIONING OF THE BOILERImportant:This condensing boiler contains components which could be damaged or blocked by grease, dirt,solder etc., fr

Seite 27

“RESET” button so that the display reverts to show the actual flow temperature ofthe boiler. Once a heating demand is received the fan will start and

Seite 28

To measure CO2 levels in the Kestonboiler remove the 1/8" plug from theflue outlet pipe spigot (Figure 6.7.4item 17). Insert

Seite 29 - LOW VOLTAGE CONNECTOR

7) Press the “RESET” button twice to return to the normal operation mode anddisplay.5.8 CHECKING THE GAS PRESSUREWith the boiler running

Seite 30 - MAIN CONNECTOR

6. FAULT FINDING6.1 ELECTRICAL CONTROL SEQUENCEWhen the external control(s) are calling for heat, power will be fed to the boiler connectionstrip at

Seite 31

QUICK REFERENCE6.2 NORMAL OPERATIONThe Qudos 28s and Qudos 28sP boilers feature a user display which shows actual flowtemperature. Howev

Seite 32

6.3 FAULT MODESIf a situation is detected which the boiler considers may cause damage to the appliance the boilerwill enter a lockout mode and stop fu

Seite 33

ERROR HISTORYThe Qudos 28s has an internal memory function that stores the last six errorsencountered along with the sensor readings a

Seite 34

0. HANDLING INSTRUCTIONS0.1 LIST OF CONTENTSThe Keston Qudos 28s and Qudos 28sP are supplied almost totally pre-assembled. The unitsuse standard 50 mm

Seite 35

6.4 FUNCTIONAL FLOW WIRING DIAGRAMWD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation & Servicing

Seite 36 - 6. FAULT FINDING

6.5 ELECTRICAL WIRING DIAGRAMWD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation & Servicing Instruc

Seite 37 - QUICK REFERENCE

6.6 ILLUSTRATED WIRING DIAGRAMWD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation & Servicing Instr

Seite 38 - 6.3 FAULT MODES

6.7 Exploded Assembly Diagrams6.7.1 Boiler Controls Assembly WD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInst

Seite 39 - ERROR HISTORY

6.7.2 Waterway, Condensate & Flue AssemblyWD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation &

Seite 40

,WD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation & Servicing Instructions Page : 40

Seite 41 - 6.5 ELECTRICAL WIRING DIAGRAM

6.7.3 Air  Gas AssemblyWD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation & Servicing Instruction

Seite 42

6.7.4 Casing AssemblyWD420/3/2007 Chapter 6 : Fault Finding The Keston Qudos 28s & Qudos 28sP BoilersInstallation & Servicing Instructions Pa

Seite 43

6.7.5 Exploded Diagrams Parts Reference ListBoiler Controls Assembly (Fig. 6.7.1)GC Number Code Description131 Q28s Main Control PCB (Q.10S.4.01

Seite 44

7. ROUTINE (ANNUAL) SERVICINGTo ensure the continued safe and efficient operation of the boiler it is necessary to carry outroutine s

Seite 45

twisting at the waist - reposition the feet instead. Avoid upper body bending when holding theappliance and keep the boiler as close to the body as po

Seite 46 - 6.7.3 Air  Gas Assembly

c. If necessary clean the burner with a mild household detergent and rinse under ahot running tap.d. If necessary, from visual inspection, clean

Seite 47 - 6.7.4 Casing Assembly

8. REPLACEMENT OF PARTSCONTENTS8.0 GENERAL8.1 PRECAUTIONS8.2 ACCESS8.3 REPLACEMENT PROCEDURE8.4 ELECTRICAL COMPONENTS8.4.1 CONTROL PANEL8.4.2 BOILER F

Seite 48

v) Remove the Control Panel by removing the four retaining screws (Fig 6.7.1,item 160).vi) Reassemble (Section 8.3)vii) Check for correct operation of

Seite 49

8.4.7 Combustion Blower (Fig. 6.7.3 item 111)i) Isolate the appliance (Section 8.1)ii) Gain access (Section 8.2)iii) Disconnect the connector block fr

Seite 50

iv) Remove the 4 nuts fixing the burner to the top of the heat exchanger (Fig 6.7.3, item120).v) Remove the spark ignition/flame detection electrode (

Seite 51 - 8. REPLACEMENT OF PARTS

iv) Drain the system to below the level of the appliance.v) Disconnect the flexible hose (Fig. 6.7.2 - 2/2 item 95) from the expansion vessel.vi) Undo

Seite 52

9. SHORT SPARE PARTS LISTItem GC No Part Denomination Item GC No Part Denomination52 Burner Kit 81 Burner Gasket72 Ignitor Gasket 53 Ignitor K

Seite 53

183 Q28s Gas Valve - Mixer Assem. 119 FanQ28sP Gas Valve - Mixer Assem.132 Control Panel 131 Q28s Control PCB Q28sP Con. PCB60 Pu

Seite 54

SHORT SPARE PARTS LIST FOR THE KESTONCONDENSING BOILER RANGEItem GC No Part Denomination52 Burner Kit81 Burner Gasket53 Ignitor Kit72 Ignitor Gasket58

Seite 55

WD420/3/2007 Chapter 10 : Benchmark Checklist Final The Keston Qudos 28s & Qudos 28sP Boilers Installation & Servicing Instructio

Seite 56 - 9. SHORT SPARE PARTS LIST

1. USER INSTRUCTIONS1.1 INTRODUCTIONThank you for choosing this Keston Qudos 28s for your household heating. The boiler isdesigned to be

Seite 57

WD420/3/2007 Chapter 10 : Benchmark Checklist Final The Keston Qudos 28s & Qudos 28sP Boilers Installation & Servicing Instructio

Seite 58 - CONDENSING BOILER RANGE

bRead Installation Manual CarefullybEnsure that ALL dust particles, filings , plastic chips etc. areremoved from the inlet pipe.bIf the i

Seite 59 - BENCHMARK No

Normal OperationDuring normal operation the digital display will show the current boiler temperature and willshow relevant operational symb

Seite 60 - SERVICE INTERVAL RECORD

1.4 SAFETY INFORMATIONIF YOU SUSPECT A GAS LEAK TURN OFF THE APPLIANCE IMMEDIATELY, TURN OFFTHE GAS TAP TO THE APPLIANCE (LOCATED UNDERNEATH) AND CONT

Seite 61 - Qudos 28s and Qudos 28sP

2. GENERAL INSTRUCTION2.1 DESCRIPTIONThe KESTON Qudos 28s and Qudos 28sP boilers utilize the latest in condensingtechnology to produce

Kommentare zu diesen Handbüchern

Keine Kommentare