16
Keston Heat - Frame & Header Kits
6.2 BOILER MOUNTING
7 HEADER KIT ASSEMBLY
7.1 FITTING MIXING HEADER AND BLANKING FLANGES
1. Fit the mixing header and blanking anges in the chosen positions, with the bolts, washers and seals supplied.
Note. Mixing header can be located either LHS or RHS of the headers.
1
Mixing Header Blanking Flange
2. Ensure the two boiler bottom xing brackets
are screwed to the frame or wall.
2
1. As appropriate mount the boilers onto either the wall plates or the side
by side frame kit.
Kommentare zu diesen Handbüchern