
7
Keston Heat - Frame & Header Kits
IMPORTANT POINTS
Before commencing installation:
If Wall mounting;
• Ensure wall is capable of supporting the weight of boilers to be mounted
• Mark drill points of header using oor mounting template
• Mark height on to the wall from the oor to the top of the boiler
• Ensure oor is at and level and is of suitable load bearing capacity
If Frame mounting;
• The frames must stand on a at and level oor of suitable load bearing
capacity.
• If using a frame kit (UIN 355013) the header must be bolted to the frame before
the hoses are connected to the boiler.
These Installations refer to perpendicular wall and oor. If walls are not
perpendicular, it is recommended that a frame kit be used (UIN 355013). The
correct number of frames should be ordered (1 per boiler).
Allowances must be made for installation where skirting boards or other features
are in place that may affect the nominal installation conditions.
Kommentare zu diesen Handbüchern